Planning wall work in an older Tacoma home
The survey has to follow the remodel. Walls that come out, walls that get new openings and ceilings that are lowered all need to be in scope, along with layers hidden behind paneling or later drywall. A kitchen plan that changes after sampling should be checked against the report before the first cut.
Historic review is a separate track. Tacoma’s tip sheet describes it for demolition permits on buildings over 50 years old or in Mixed-Use Centers and National Register districts. Owners of designated landmarks or properties in historic districts should confirm with the City what any exterior or structural change needs.
Plaster is heavy, bulky waste. Generated inside the City of Tacoma, it can go to Tacoma Landfill on Mullen Street with a shipment record; outside city limits it goes to Hidden Valley Transfer Station or another facility on PSCAA’s list.
Wall layers that have not been sampled yet belong on a survey first; our page on asbestos testing and surveys sets out how that report is scoped for a remodel. For the ceiling above or the floor beneath the same wall, see the rest of Tacoma Asbestos Removal.