Rules that change for rental and commercial owners
Compared with an owner-occupied house, rental and commercial work adds requirements at every step. An AHERA inspector has to do the survey, and only that inspector can clear a suspect material. Removal falls to a certified asbestos abatement contractor, with certified workers under a certified supervisor as state law requires.
Notifications scale with quantity: PSCAA’s thresholds and tiers, L&I’s notice for projects over 48 square feet or 10 linear feet, and the owner’s survey summary posted or given in writing to everyone who might contact the material, maintenance staff and other trades included.
Waste shipment records belong in the owner’s file. PSCAA expects a copy signed by the disposal site to come back within 35 days, a written report if it has not arrived by 45, and records kept for at least two years.
When a building is coming down rather than being refitted, pre-demolition asbestos abatement takes over; single-family work is on the main Tacoma Asbestos Removal page.